Our service packages

ENERGY PRODUCTION

This is a stand alone project with dedicated CO2 source. Aim of the project will be the desired energy production.

CARBON DIOXIDE MITIGATION

The project will be designed according to the CO2 mitigation requirements of the existing factories. Aim of the project will be CO2 mitigation and energy production.

Both the packages are implemented in three phases. The whole system hardware is divided into biomass production and fuel production modules.

 

Phase I

Phase II

Phase III

Site evaluation

Pilot facility

Full scale

 

Feasibility study of the site/flue gas for the suitability of the  project

Field trial of micro facility for  2 months

 

 

Installation of Pilot facility of 2000 sq m

Validation and  confirmation of all system design up to biomass production

 

 

Replicate pilot facility to full scale

Forward integration of fuel production module

Trial run and commercial production of full facility for optimum CO2 mitigation and / energy production