This is a stand alone project with dedicated CO2 source. Aim of the project will be the desired energy production.
CARBON DIOXIDE MITIGATION
The project will be designed according to the CO2 mitigation requirements of the existing factories. Aim of the project will be CO2 mitigation and energy production.
Both the packages are implemented in three phases. The whole system hardware is divided into biomass production and fuel production modules.
|
Phase I |
Phase II |
Phase III |
|
Site evaluation |
Pilot facility |
Full scale |
|
Feasibility study of the site/flue gas for the suitability of the project Field trial of micro facility for 2 months
|
Installation of Pilot facility of 2000 sq m Validation and confirmation of all system design up to biomass production
|
Replicate pilot facility to full scale Forward integration of fuel production module Trial run and commercial production of full facility for optimum CO2 mitigation and / energy production
|